Programme planning built, resourced and statused in Primavera P6 — by planners who have run the schedule on major capital projects.
The capability
The programme is the most contested document on a major project. MAP planners build schedules that survive that contest — logic-linked, resourced and honest about risk.
Our consultants have planned major UK infrastructure and energy programmes from first tender schedule through baseline, re-baseline and close-out. They work in Primavera P6 as a matter of course: structured breakdown, disciplined calendars, defensible logic and progress measurement that reflects what is actually happening on site.
That discipline matters most when the programme is under pressure. A schedule built properly is the foundation for early warning, honest reporting and — if it comes to it — delay analysis that stands up to examination.
How MAP delivers it
P6 planning support runs from a single peer review to an embedded planning function.
Tender and baseline programmes
Development of tender, contract and baseline programmes with logic, resource and constraint decisions that will bear examination at every gate.
Progress and statusing
Period-by-period statusing, critical path monitoring and float management, reported in language the whole project team can act on.
Schedule assurance
Independent health checks on logic density, open ends, constraint use, float paths and calendar structure — before a client or auditor runs the same checks.
Delay-ready records
Programme narratives and records maintained so that, if a dispute comes, the analysis draws on evidence rather than reconstruction.