Detailed Design
Design development from scheme to construction status — drawings, specifications and details a contractor can price, procure and build without guesswork.
The capability
Most design problems on site are not scheme errors. They are gaps — details never drawn, specifications never reconciled, interfaces never closed. Detailed design is the discipline of closing them.
Our engineers take schemes through to construction status on infrastructure and energy projects: general arrangements into fabrication-ready details, outline specifications into enforceable ones, and design assumptions into confirmed dimensions, fixings and tolerances. The work is multi-discipline by nature, and it is planned against the procurement schedule so that packages reach the supply chain complete.
Buildability is tested at this stage or not at all. Details are reviewed against access, sequence, tolerance stack-ups and the temporary condition, and DfMA opportunities are taken where repetition justifies them. A detail that cannot be built as drawn is a defect — one we would much rather find on paper than in the ground.
How MAP delivers it
Detailed design is delivered as a full stage or as targeted completion of someone else's scheme.
Construction-status drawings
Development of general arrangements, sections and details to issue-for-construction standard, coordinated across disciplines before release.
Specifications and schedules
Technical specifications, material schedules and performance requirements written to be enforced on site, not merely referenced in the contract.
Buildability and DfMA review
Systematic review of details against sequence, access and tolerance, with off-site and modular options developed where they earn their place.
Package completeness
Design deliverables aligned to the procurement and construction programme, so each package is complete at the moment the supply chain needs it.
Discuss your design scope.
Speak directly to a senior design engineer.